• italiano
  • italiano
  • english
  • francais

Special installations

Design & engineering and dismantling of the 380 kV pylons using a special helicopter
Collaboration with Eliswiss International

 

Design & engineering and installation of trestle single-stem and tubular pylons using a special S-64 Erickson helicopter (10 ton capacity.)
Collaboration with Erickson Air Crane e European Air Crane

 

Execution and design of special foundations for 380 kV trestle pylons

 

Installation of the 380 kV pylon designed by Norman Foster
Stringing and design of work equipment for Foster pylons

 

Stringing and design of work equipment for tubular pylons

 

© 2025 Elettrodotti Cantamessa & Co. S.p.A. | P.Iva 01 567 460 165 | Privacy Policy - Cookie Policy - Credits