Works performed:
1.400 km of 380 kV power lines / 1.200 km of 220 kV power lines / 3.000 km of 132 kV power lines
![]() |
|
|
• “turnkey” power lines: design, supply of all materials and construction works
• Design, supply of materials, completion of environmental formalities, characterisation of land, ordnance reclamation and environmental impact study
• Obtaining of power line easement
• Specialisation in building power lines in high mountain and generally inaccessible areas: helicopter hoistable machinery and equipment
• Execution of special deep pile foundations, tubfix and anchorage to the rock
1907 construction of the first electric line: 70 kV Cedegolo - Sesto S. Giovanni, on behalf of the company Idroelettrica Adamello
1926 construction of the first 105 km 132 kV Chiavenna - Arquata power line, on behalf of the company Elettrica Cisalpina
1970s:
• Installation of pylons using crane trucks
• Transportation of materials by helicopter
• Laying pilot lanyards by helicopter
• Special pylon foundations on micropiles in rock
1974 construction of the first section of the experimental 1000 kV power line at the Enel test field in Viverone
1907 | 1974 | 1990 | 1995 |
![]() |
![]() |
|
|
1990 design, construction of machinery and stringing of the experimental 1050 kV Suvereto power line: lines with "circus" type pylons and conductors with eight sub-conductors
1995 design of the system and dismantling of the 380 kV pylons with a special helicopter
2002 design of the system and installation of the trestle and single-stem tubular pylons using a special S-64 Erickson helicopter (10 ton capacity.)
2006 design, supply of all materials and construction of the 380 kV Leinì mixed overhead - buried power line consisting of: overhead cable section, overhead/buried transit station, buried cable section
2010 construction and stringing of a 380 kV power line using the special Foster pylons
2002 | 2010 |
|
|